2.

3 129 : by

2. The plans have just been completed by The Surveyor General; but the Head Master (M. Wright) desires some Modifications. When these have been fully discussed, I will submit the plans for Your Lordship's approval.

3. Your despatch, in reply to our despatch now under reference, refers to the five new Schools recommended by the Commission on Education. They are the same as those the construction of which was sanctioned by Sir M. Stubbs Beach. I am informed, however, that they could not now be built for The original Estimate, £7000 being the price of skilled labour has of late risen considerably.

4. I have visited the Existing Central School, which certainly is very deficient in both space and arrangements, and also the site proposed for the new one, which is to the best of my belief the best site available.

5. With regard to the Students living in the building, and the Supervision of the Normal School, (which is on a temporary arrangement), and other Matters connected with it, I Annex a report from the Head Master which gives some curious and interesting particulars. I have further ascertained that...

Edit History

2026-05-23 06:34:23 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
2. 3 129 : by 2. The plans have just been completed by The Surveyor General; but the Head Master (M. Wright) desires some Modifications. When these have been fully discussed, I will submit the plans for Your Lordship's approval. 3. Your despatch, in reply to our despatch now under reference, refers to the five new Schools recommended by the Commission on Education. They are the same as those the construction of which was sanctioned by Sir M. Stubbs Beach. I am informed, however, that they could not now be built for The original Estimate, £7000 being the price of skilled labour has of late risen considerably. 4. I have visited the Existing Central School, which certainly is very deficient in both space and arrangements, and also the site proposed for the new one, which is to the best of my belief the best site available. 5. With regard to the Students living in the building, and the Supervision of the Normal School, (which is on a temporary arrangement), and other Matters connected with it, I Annex a report from the Head Master which gives some curious and interesting particulars. I have further ascertained that...
Baseline (Original)
2. 3 129 : by 2. The plans have just been completed The Surveyor General; but the I Strid Master (M. Wught) desires some Modifications. When Nere have been fully discussed, I will submit the plans for Your Lordships approval. 3. Your despatch our despatch how under reply, refers to the five new Schools accommended by the Ernermussion on Pancation. They are the came as Phone Ne construction of which was sanctioned by Siri M. Sticks Beach. I am informed, however, that they could not how be built The original Estimate, ية 7000 a pince is the price of chilled labour has of late. rish considerably. 4. Shave visited the Exacting Contial. School, which certainly is very deficient. in both space and arra arrangments, and also the site propized for the new- which to the best site available. 5. With Etudents ling iegand building, to the Supervision of the on the prenness of the Normal School, (which is on a limporary arrangement). and other Matters connuded with it, I Anex a report from the strad Master which grows some curious and interesting particulars. I have further ascertained that?"
2026-05-23 06:34:23 · Baseline
View content

2.

3 129

: by

2. The plans have just been completed

The Surveyor General; but the I

Strid Master (M. Wught) desires some Modifications. When Nere have been fully discussed, I will submit the plans for Your Lordships approval.

3. Your despatch

our despatch how under

reply, refers to the five new Schools

accommended by the Ernermussion on

Pancation. They

are the came as Phone

Ne construction of which was sanctioned by Siri M. Sticks Beach. I am

informed, however, that they could not

how be built

The original Estimate,

ية

7000

a pince

is the price of chilled labour has of late. rish considerably.

4. Shave visited the Exacting Contial. School, which certainly is very deficient.

in both space and arra

arrangments, and

also the site propized for the new-

which to the best site available.

5. With

Etudents ling

iegand

building,

to the Supervision of the

on the prenness of the Normal

School, (which is on a limporary arrangement).

and other Matters connuded with it, I Anex a report from the strad Master which grows some curious and interesting particulars. I have further ascertained that?"

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.